L-CNG Refueling Station

Send Inquiry
L-CNG Refueling Station
Details
The L-CNG Refueling Station is a complete fueling solution that converts transported LNG into high-pressure CNG for vehicle refueling, making it ideal for regions without pipeline natural gas infrastructure.
Category
LNG Refueling Station
Share to
Description

The L-CNG Refueling Station is a complete fueling solution that converts transported LNG into high-pressure CNG for vehicle refueling, making it ideal for regions without pipeline natural gas infrastructure. Designed for commercial fleet operators, gas station investors, and EPC contractors, the system delivers reliable, continuous fueling while reducing infrastructure dependence and supporting future capacity expansion.

 

Typical System Configuration

 

Equipment Module

Primary Function

LNG Storage Tank

Cryogenic containment of liquid natural gas

Cryogenic High-Pressure Pump

Pressurizes liquid natural gas to high-pressure state

High-Pressure Vaporizer

Converts cryogenic liquid into ambient high-pressure gas

Priority Panel

Directs sequential gas flow to CNG cascade storage

CNG Storage Cylinder Cascade

Buffer storage for pressurized natural gas

CNG Dispenser

Metered fuel delivery to end-user vehicles

PLC Control Cabinet

Automated process monitoring, safety logic, and operational control

Safety Monitoring System

Gas leak detection, optical/thermal sensing, and automated ESD

 

Technical Features & Automation

 

High-Pressure Fuel Supply
Cryogenic LNG is pressurized by a high-pressure pump and vaporized into stable CNG at up to 25 MPa, ensuring consistent fueling performance during continuous operation.
Optimized Fueling Efficiency
The intelligent priority control system automatically switches between high-, medium-, and low-pressure storage banks, shortening vehicle filling time while maximizing gas utilization.
Flexible Project Configuration
Each station can be engineered according to daily fueling demand, available installation space, local regulations, and future expansion requirements.
Reduced Site Installation Time
Factory-integrated skid-mounted modules minimize on-site piping, wiring, and commissioning work, helping reduce project schedules and installation costs.
Intelligent Safety Monitoring
The PLC control system continuously monitors operating conditions and automatically activates alarms or emergency shutdown procedures if abnormal conditions are detected.

 

Applications

 

Public bus and municipal transportation depots

Commercial logistics and trucking fleets

LNG virtual pipeline projects

Industrial parks with captive vehicle fleets

Public CNG fueling stations

Multi-energy fueling stations integrating LNG, CNG, EV charging, or hydrogen systems

Customization Options

 

Configurable Item

Available Options / Execution

Capacity Engineering

Custom LNG tank volume, daily throughput capacity, and CNG storage sizing

Dispensing Hardware

1 to 8 dispenser hoses

Automation & Integration

Standard PLC / Remote Monitoring / Full SCADA network integration

Payment Protocols

IC Card / RFID / POS terminal / Centralized online billing system

Hazardous Area Compliance

ATEX / IECEx / Regional explosion-proof standards

Containerization

Optional enclosed container design (weather protection & acoustics)

 

Manufacturing & Quality Assurance

 

Each station undergoes comprehensive Factory Acceptance Testing (FAT) before shipment to ensure stable operation after installation.
Factory Testing Includes
Cryogenic pressure testing
High-pressure pipeline strength verification
Gas leakage inspection
PLC control logic simulation
Emergency shutdown (ESD) functional testing
Instrument calibration
Complete system trial operation before shipment

EPC Engineering & Technical Support

 

We provide comprehensive engineering support throughout the project lifecycle.
Engineering Services
Process Flow Diagram (PFD)
Piping & Instrumentation Diagram (P&ID)
Foundation drawings
Equipment layout drawings
Utility requirement documentation
Installation Support
On-site commissioning supervision
Operator training
System performance verification
Spare parts recommendations
Remote technical support after startup

 

Packaging & Delivery

 

01/

Secure Export Packaging
Skid-mounted modular structure for container transportation
Export-grade wooden cases for electrical cabinets and instruments
Anti-corrosion protection for long-distance shipping
Shipping marks and documentation prepared according to destination requirements

02/

Delivery Support
Factory pre-assembly before shipment
Export documentation package
Installation manuals
Commissioning guidance
Spare parts list and maintenance documentation

 

FAQ

 

Q: What information is required before requesting a quotation?

A: To recommend the most suitable solution, we typically require your estimated daily fueling demand, vehicle types and quantity, installation location, available utilities, local design standards, and any project-specific requirements.

Q: What factors determine the price of an L-CNG refueling station?

A: Project cost mainly depends on LNG storage capacity, daily fueling throughput, number of dispensers, automation level, certification requirements, and the scope of engineering services. Transportation and site conditions may also influence the overall investment.

Q: How long does manufacturing and delivery usually take?

A: Lead time varies depending on station capacity and customization level. Standard configurations generally require less production time, while large EPC projects may need additional engineering, factory testing, and documentation before shipment.

Q: Can the station comply with my country's regulations?

A: Yes. The station can be designed to meet applicable regional standards and certification requirements, including pressure equipment, explosion protection, and electrical safety regulations, subject to local project specifications.

Q: What maintenance is required after commissioning?

A: Routine maintenance includes periodic inspection of cryogenic pumps, valves, instrumentation, safety devices, and control systems. Preventive maintenance schedules and operating manuals are supplied with every project to help maximize equipment availability.

Q: Do you provide spare parts and long-term technical support?

A: Yes. We offer recommended spare parts packages, remote technical assistance, troubleshooting support, software updates where applicable, and engineering consultation throughout the equipment's service life.

Q: Can engineers provide overseas installation and commissioning?

A: Yes. Depending on project requirements, we can provide on-site technical supervision, commissioning support, operator training, and remote assistance to help ensure efficient project startup.

Q: Can the station be expanded in the future?

A: Yes. The modular design allows additional LNG storage, CNG storage cylinders, dispensers, or auxiliary equipment to be integrated as fueling demand increases, helping protect long-term investment without replacing the entire station.

Hot Tags: l-cng refueling station, China l-cng refueling station manufacturers, suppliers, factory, lng emergency shutdown system, lng fuel station, lng refueling facility equipment, lng station dispenser, lng station process equipment, lng station refueling machine

Send Inquiry