Skid-mounted LNG Storage Tank

Send Inquiry
Skid-mounted LNG Storage Tank
Details
The Skid-Mounted LNG Storage Tank is a modular LNG supply system integrating vacuum-insulated storage, self-pressurization, vaporization, pressure regulation, metering, control and safety functions on prefabricated steel skids. The integrated design reduces on-site piping and commissioning work and is suitable for industrial, commercial and decentralized natural gas supply.
Category
LNG Storage Tank
Share to
Description

The Skid-Mounted LNG Storage Tank is a modular LNG supply system integrating vacuum-insulated storage, self-pressurization, vaporization, pressure regulation, metering, control and safety functions on prefabricated steel skids. The integrated design reduces on-site piping and commissioning work and is suitable for industrial, commercial and decentralized natural gas supply.

 

System Configuration

 

Module

Main Equipment

Function

LNG Storage Module

Vacuum-insulated LNG storage tank

Stores LNG under cryogenic conditions

Self-Pressurization Module

Pressure-building vaporizer, pressure regulating valve

Maintains tank pressure for stable LNG discharge

Vaporization Module

Air-heated vaporizer

Converts LNG into gaseous natural gas

Pressure Regulation Module

Multi-stage regulator valve group

Reduces gas pressure to the required downstream level

Metering Module

Flow meter, associated instruments

Measures gas consumption or supply flow

Odorization Module

Gas odorizer

Adds odorant where required by the application

BOG Handling Module

BOG heater or recovery device

Handles boil-off gas generated during LNG storage

Control Module

PLC control cabinet, HMI/SCADA

Provides automatic control, monitoring and alarm management

Instrument Air Module

Air compressor and air treatment components, if required

Provides instrument air for pneumatic valves

Safety Module

ESD, safety valves, gas/flame detection interface

Provides emergency shutdown and safety protection

Skid Structure

Carbon steel or engineered steel skid frame

Supports and integrates the system components

 

Typical Applications

Industrial process heating and production lines

Food processing and commercial kitchens

Ceramic, glass and building-material plants

Textile and chemical manufacturing

Distributed energy and gas supply stations

Natural gas supply for remote or off-grid facilities

 

Verified Global Field Deployments

 

[CASE STUDY] 50m³ Skid-Mounted LNG System for South American Mining Plant
Location: High Altitude Region (3,800m above sea level)
Challenge: Extreme temperature fluctuations (-15°C to 25°C) & high seismic activity.
Solution: Custom ASME IX welded frame, anti-seismic anchor design and dual-redundant pressure regulator manifold.
Outcome: Reduced client's factory diesel fuel cost by 42% within 6 months of commissioning. Zero vacuum loss recorded after 3 years.

 

Customization for Project Requirements

 

LNG supply requirements vary significantly according to gas consumption, ambient conditions, storage autonomy and downstream pressure. The system can therefore be engineered around the customer's operating parameters.

 

Customization Item

Available Configuration

Storage Capacity

Configured according to required LNG storage volume

Number of Tanks

Single or multiple tanks

Vaporization Capacity

Selected according to peak gas demand

Outlet Pressure

Configured for downstream pipeline requirements

Metering System

Meter type and range selected according to flow requirements

Control System

PLC, HMI and optional SCADA/remote monitoring

BOG Treatment

Heating, recovery or project-specific configuration

Instrumentation

Pressure, temperature, level and flow monitoring

Electrical Standard

Adapted to project voltage and applicable electrical requirements

Skid Arrangement

Single-skid or multi-skid configuration

Piping Connections

Customized according to site interface requirements

Branding

Nameplate, documentation and packaging customization available

 

Factory Manufacturing

 

The skid-mounted configuration shifts a significant portion of assembly work from the installation site to the factory. Equipment positioning, internal process piping, valve installation, instrumentation and cable routing can be completed and inspected before shipment.
This approach can help reduce field welding, piping assembly and commissioning work, particularly where installation space or site conditions are limited.
Xinxiang Chengde Energy Technology Equipment Co., Ltd. operates one equipment industrial park and three manufacturing bases, with approximately 160 acres of total area, 69,000 m² of standardized workshops and 500+ employees. Founded in 2002, the company has experience in pressure equipment manufacturing, design and installation.

 

Pressure Equipment Qualifications

 

Xinxiang Chengde has obtained:
A2-level pressure vessel manufacturing license
Pressure vessel design license
Pressure pipeline design license
Pressure pipeline installation license
ASME certification
CE certification
National Low Temperature Testing Center product type certification
ISO quality and environmental management certifications
70+ patented achievements
These qualifications support the manufacturing and engineering capabilities required for pressure vessels, cryogenic equipment and integrated gas supply systems.

Quality Control

 

Quality control covers the major stages from pressure vessel fabrication to skid assembly and system integration.
Raw material and component inspection
Pressure vessel fabrication and welding control
Welding procedure and inspection records
Tank pressure and leak testing
Vacuum insulation inspection
Valve and instrument verification
Piping assembly and pressure testing
Control cabinet and electrical inspection
Safety device configuration checks
Factory inspection before shipment
For project orders, inspection and documentation requirements can be agreed during the technical clarification stage.

 

Packaging & Delivery

 

Packaging: Standard export packaging or customized packaging
Shipping: Sea freight for complete skid systems; air express may be used for applicable spare parts or small components.

 

FAQ

 

Q: What LNG storage capacities are available?

A: The storage tank can be engineered in different capacities according to the customer's LNG consumption, storage autonomy, transportation limitations and site conditions. Configurations from several cubic meters to approximately 100 m³ are possible for suitable projects.

Q: What information is required to receive a quotation?

A: For a technically accurate quotation, buyers should provide the required LNG storage capacity, gas consumption or peak flow, inlet and outlet pressure, ambient temperature range, power supply, installation location, applicable standards and required control or monitoring functions.

Q: How is the skid-mounted LNG system installed and commissioned?

A: The skid is positioned on the prepared foundation and connected to the LNG filling line, gas outlet, utilities, electrical supply and safety interfaces. Commissioning includes leak checks, valve and instrument verification, control-system testing and functional checks before operation.

Q: What documentation is supplied with the LNG skid system?

A: Typical documentation includes the P&ID, general arrangement drawing, equipment specifications, electrical diagrams, instrument list, pressure vessel documents, inspection records, operation and maintenance manuals, installation instructions and shipping documents. The final document package is agreed before production.

Q: What maintenance is required for a skid-mounted LNG storage system?

A: Routine maintenance typically includes inspection of valves, pressure and level instruments, vaporizer surfaces, safety devices, piping connections and control components. Maintenance intervals should follow the equipment manufacturer's instructions and applicable local regulations.

Q: Can spare parts be supplied after delivery?

A: Yes. Replacement valves, instruments, control components, seals and other applicable spare parts can be supplied according to the equipment configuration. Recommended spare parts can also be identified during project planning.

Q: What site conditions should be confirmed before purchasing?

A: The project should confirm the available installation area, foundation conditions, LNG delivery access, gas pipeline connection point, power supply, ambient temperature, ventilation, safety distances and applicable local regulations. These factors affect the final system layout and configuration.

Hot Tags: skid-mounted LNG storage tank, China skid-mounted LNG storage tank manufacturers, suppliers, factory

Send Inquiry